POWER-GRID ART · UTILITY WORK IN ORDER · UNOFFICIAL

The work, in order

Seven steps for a utility job (plan and scope, permits and notifications, traffic control, site safety and PPE, the work, energize and close out, restore and document), each linked to the free references on this site: the Kit, MUTCD Part 6 by state, the calculators, your state offices. Reference only, not engineering advice. Unofficial.

JavaScript is required for the full interactive site. The links above work without it.